I ordered them from Amazon on July 30. They’re shipping from China. Based on the current tracking information, I expect to receive them by the end of next week.
I’m not in a big hurry at this point. I’m still waiting to receive the laser-cut parts (end of this week), and I haven’t started soldering the PCB yet. My plan is to get the electronic and mechanical stuff working, then figure out how and where to build the table. I sold most of my woodworking tools when I downsized from a house to a condo prior to a 3-year stint in the Philippines. At this point I’m thinking of renting time in a local maker space.